During start-up, our experts calibrate the burner and combustion system, set feedwater and level controls, and optimise the unit’s performance under load. Site Acceptance Tests (SAT) confirm the unit is operating to required standards.
All results are documented in a comprehensive commissioning report, including test records and final settings. We also provide on-site training for operators, covering daily use, start and stop procedures, and routine maintenance.
If you need more than commissioning, we offer a turnkey service. This includes coordination with your installers, water-treatment partner and BMS or PLC integrator. We also provide method statements and site risk assessments such as HAZOP.
With Clayton, commissioning is the foundation for long-term performance and safe, reliable steam supply.